|
| |
Inscription on Concrete Slab in Stanley Park re. HMS Egeria
This concrete slab was set by the Royal Engineers UK in 1865 and was used as
a survey point in 1898 by the Royal Navy survey ship H.M.S. Egeria.
|
Year |
HIC |
Capt./Sail. Master |
Location |
Survey Type |
|
1903 |
Cdr. J.F. Parry |
|
NW of Vancouver Island |
Hydrographic |
|
1904 |
Cdr. J.F. Parry |
|
Active Pass, Nanaimo, BC |
Coastal |
|
1905 |
Cdr. J.F. Parry |
|
Strait of Georgia, BC |
Hydrographic |
|
1906 |
Capt.F.C.Learmonth |
|
Port Simpson, BC |
Coastal |
|
1907 |
Capt.F.C.Learmonth |
|
Dixon Entr/Hecate Strait |
Coastal |
|
1908 |
Capt. J.F. Parry |
|
Dixon Entr/Hecate Strait Sansuum Narrows, BC |
Hydrographic |
|
1909 |
Capt. J.F. Parry |
|
Dixon Entr/Hecate Strait Edye, Beaver, Schooner Passages, BC |
Hydrographic |
|
1910 |
|
|
Port Simpson |
Coastal |
|
|
|
|
|
|
|
1913
|
|
|
Sold, broken up, burned
|
|
|